BẢN VẼ THI CÔNG
CONSTRUCTION DRAWING
THINK SAFETY - WORK SAFELY
Rev
No.
Rev Description
Rev Date
20957
9082
E3
11875
E1
-0.700 m
-0.700 m
-0.700 m
Mặt bằng định vị / Key plan:
-4.400 m
12090
15990
K1
J1
15700
15000
Zone A
Excavator 1
Chủ đầu tư / Owner:
-4.900 m
SONKIM LAND CORPORATION
-0.200 m
5500
4000
32775
-0.200 m
Sump Pit
4000
H1
10000
B3
4000
4000
6150
E1
Sump Pit
Excavator 2
Separate zone line
Địa chỉ / Address:
Kiểm / Checked by:
Ngày / Date:
Duyệt / Approved by:
Ngày / Date:
-0.200 m
-0.200 m
TC3's foundation
-2.400 m
-3.700 m
Dự Án / Project:
SKL GATEWAY APARTMENTS
PROJECT
-0.200 m
-2.400 m
Thao Dien Ward, District 2, HCM city
Sheet piles L=12m
20242
15°
21
°
14727
A1
16450
14727
1
4
E1
5
6
7
8
9
EXCAVATION METHOD :DIRECTION OF EXCAVATION
1 : 250
10
11
STAGE 1 EXCAVATOR TO
-4,900m &
CONSTRUCT TC1, TC3
's FOUNDATIONS
Số hiệu bản vẽ / Sheet #:
Tỉ lệ / Scale: Ngày / Date:
Vẽ / Drawn
Rev Description
Rev Date
Mặt bằng định vị / Key plan:
Gate 1
Temporary fence
Safety Railling
CDM Piles
-0,200
-0,200
-0,200
Excavator
-4,900
Chủ đầu tư / Owner:
SONKIM LAND CORPORATION
1
SECTION E1
SECTION E2
Gate 2
108 Cao Thang St.,Ward 4, Dist. 3, HCMC, VN
Dự Án / Project:
SKL GATEWAY APARTMENTS
PROJECT
Temporary fence
CDM Piles
Safety Railling
-0,200
-0,200
-0,200
Thao Dien Ward, District 2, HCM city
Dự án số / Project #:
Hạng Mục / Item:
-4,900
Excavator
Tên bản vẽ / Drawing name:
Rev Description
Rev Date
Mặt bằng định vị / Key plan:
-1.700 m
-3.700 m
-0.200 m
-2.400 m
Chủ đầu tư / Owner:
Raft foundation of Block B
-4.900 m
SONKIM LAND CORPORATION
Ta
nk
-1.700 m
B lo
ck
-0.200 m
B
A
ck
Blo
&B
B
ck
-0.200 m
Raft foundation of Block A
Ngày / Date:
Duyệt / Approved by:
Ngày / Date:
TC1's foundation
-4.900 m
-0.200 m
Địa chỉ / Address:
Kiểm / Checked by:
-0.700 m
H.LIEM
Kiểm /
Checked by:
D.NAM
Duyệt /
Approved by:
VQ.LONG
BẢN VẼ THI CÔNG
CONSTRUCTION DRAWING
THINK SAFETY - WORK SAFELY
Rev
No.
Rev Description
Rev Date
-4,900
E3
E1
-0.700 m
Existing Piles
Continue to excavate to level -5.9 and
demolition head bord pipe to design level
-0.200 m
-0.200 m
Chủ đầu tư / Owner:
Owner
Piles head cutting
-0.200 m
Excavator 1
H1
Sump Pit
-1.700 m
Địa chỉ / Address:
Existing Piles
G1
Tư vấn / Consultant:
Tank Bottom Block A & Block B
Raft foundation of Block B
-4.200 m
-5.900 m
Excavator 2
D1
Địa chỉ / Address:
Kiểm / Checked by:
Nhà thầu / Contractor:
-1.700 m
21°
Tank of Block B
C1
-0.200 m
B1
-1.700 m
-0.200 m
108 Cao Thang St.,Ward 4, Dist. 3, HCMC, VN
2 3
4
1
E1
5
6
7
8
9
10
11
Tên bản vẽ / Drawing name:
STAGE 2 - EXCAVATOR TO
-5,900m & BREAK PILES
HEAD
EXCAVATION METHOD DRAWING - STAGE 2
1 : 250
Số hiệu bản vẽ / Sheet #:
Gate 1
Rev Description
Rev Date
Safety Railling
CDM piles
-0,200
Mặt bằng định vị / Key plan:
Piles head cutting
-0,200
-5,900
Existing piles
Chủ đầu tư / Owner:
2
SECTION E1 - EXCAVATION METHOD - STAGE 2
SONKIM LAND CORPORATION
Địa chỉ / Address: 53-55 Nguyen Dinh Chieu
Existing piles
1
SECTION E2 - EXCAVATION METHOD - STAGE 2
108 Cao Thang St.,Ward 4, Dist. 3, HCMC, VN
Gate 2
Dự Án / Project:
SKL GATEWAY APARTMENTS
PROJECT
Thao Dien Ward, District 2, HCM city
Dự án số / Project #:
Temporary fence
CDM Piles
-0,200
Safety Railling
-0,200
Hạng Mục / Item:
-0,200
Tên bản vẽ / Drawing name:
-5,900
BẢN VẼ THI CÔNG
CONSTRUCTION DRAWING
THINK SAFETY - WORK SAFELY
Rev
No.
Rev Description
Rev Date
Mặt bằng định vị / Key plan:
-1.700 m
-3.700 m
-0.200 m
-2.400 m
Chủ đầu tư / Owner:
Ra
ft
Ta
nk
fou
nd
ati
-5.900 m
-4.200 m
-0.200 m
loc
Sump Pit
nk
Ta
tto
Bo
m
Blo
ck
kB
B
A&
Địa chỉ / Address:
Kiểm / Checked by:
Ngày / Date:
Thao Dien Ward, District 2, HCM city
Dự án số / Project #:
Hạng Mục / Item:
1
3D_VIEW - EXCAVATION METHOD - STAGE 2
Tên bản vẽ / Drawing name:
3D_VIEW - S2 - EXCAVATOR
TO -5,900m & BREAK PILES
HEAD
Số hiệu bản vẽ / Sheet #:
Tỉ lệ / Scale:
Ngày / Date:
Vẽ / Drawn
by:
Author
Kiểm /
Checked by:
THAO
PHAM
S_116
Sửa đổi /
-4.400 m
-4.400 m
-0.200 m
L1
-0.200 m
Raft foundation of Block A
-5.900 m
K1
J1
H1
8300
6710
600
4600
G1
Tư vấn / Consultant:
7550
1770
600
F1
13790
5900
Timper Piles
(25 piles/m2)
L=6m
-1.700 m
4500 600
600
2540
-1.700 m
Timper driver
950
600
-0.200 m
-0.200 m
TC3's foundation
2500
D1
Timper driver
5500
4000
-1.700 m
-4.200 m
1500
2500
21°
Nhà thầu / Contractor:
600
Timper Piles
(25 piles/m2)
-3.700 m
Thao Dien Ward, District 2, HCM city
A1
21
°
Dự án số / Project #:
15°
Hạng Mục / Item:
-2.400 m
-0.200 m
Tên bản vẽ / Drawing name:
E3
1
2 3
4
1
E1
5
H.LIEM
Kiểm /
Checked by:
D.NAM
Duyệt /
Approved by:
VQ.LONG
BẢN VẼ THI CÔNG
CONSTRUCTION DRAWING
THINK SAFETY - WORK SAFELY
Rev
No.
Rev Description
Rev Date
Gate 1
Mặt bằng định vị / Key plan:
CDM Piles
Satety Railling
-0,200
Timper piles
Ngày / Date:
Duyệt / Approved by:
Ngày / Date:
Excavator
-5,900
Timper piles
(L=6m)
-5,900
Nhà thầu / Contractor:
1
SECTION E2 - EXCAVATION METHOD - STAGE 3
108 Cao Thang St.,Ward 4, Dist. 3, HCMC, VN
Gate 2
Dự Án / Project:
SKL GATEWAY APARTMENTS
PROJECT
Thao Dien Ward, District 2, HCM city
Temporary fence
CDM Piles
Rev.:
17 Oct 2015
00
Vẽ / Drawn
by:
Author
Kiểm /
Checked by:
THAO PHAM
Duyệt /
Approved by:
VIET NGO
BẢN VẼ THI CÔNG
CONSTRUCTION DRAWING
THINK SAFETY - WORK SAFELY
Rev
No.
Rev Description
Rev Date
Mặt bằng định vị / Key plan:
-1.700 m
Ngày / Date:
Duyệt / Approved by:
Ngày / Date:
-5.900 m
Excavator
-0.700 m
Nhà thầu / Contractor:
-0.200 m
108 Cao Thang St.,Ward 4, Dist. 3, HCMC, VN
Dự Án / Project:
SKL GATEWAY APARTMENTS
PROJECT
Thao Dien Ward, District 2, HCM city
Dự án số / Project #:
Hạng Mục / Item:
Tên bản vẽ / Drawing name:
1
No.
E3
Rev Description
Rev Date
E1
-0.700 m
-0.700 m
-0.700 m
Mặt bằng định vị / Key plan:
-5.900
1525 250
2800 1600
960
24475
-6.900
500
2800
TC1's foundation
Chủ đầu tư / Owner:
5100
-7.300
2050
6300
2310
11890
2990
15110
5360
9999
SONKIM LAND CORPORATION
1035
-0.200 m
-4.200 m
Ngày / Date:
Duyệt / Approved by:
Ngày / Date:
Nhà thầu / Contractor:
-0.200 m
6250
4650
Địa chỉ / Address:
Kiểm / Checked by:
TC3's foundation
1710
-8.100
17502000
Tank of Block B
-0.200 m
-8.400
-8.600
9150
E1
-5.900 m
7550
9840
-5.900
Địa chỉ / Address: 53-55 Nguyen Dinh Chieu
Street, Ward 6, District 3, Ho Chi Minh City
5210
-8.100
2475
E2
6650
4230
2500
1025
4500
H1
2345 1855
2700
-0.200 m
-9.600 m
-0.200 m
-3.700 m
6500
108 Cao Thang St.,Ward 4, Dist. 3, HCMC, VN
-3.700 m
1100
2 3
4
1
E1
5
6
7
8
EXCAVATION METHOD DRAWING - STAGE 4
9
10
11
STAGE 4 EXCAVATE TO DEEPER LEVEL
1 : 250
Số hiệu bản vẽ / Sheet #:
BPTC-EX-11
Rev Date
Safety Railling
-0,200
Mặt bằng định vị / Key plan:
-5,900
-5,900
-8,100
-8,100
Timper piles
Timper piles
2
SECTION E1 - EXCAVATION METHOD - STAGE 4
Chủ đầu tư / Owner:
SONKIM LAND CORPORATION
Gate 2
Địa chỉ / Address: 53-55 Nguyen Dinh Chieu
Street, Ward 6, District 3, Ho Chi Minh City
Tư vấn / Consultant:
SECTION E2 - EXCAVATION METHOD - STAGE 4
108 Cao Thang St.,Ward 4, Dist. 3, HCMC, VN
Gate 2
Dự Án / Project:
SKL GATEWAY APARTMENTS
PROJECT
Thao Dien Ward, District 2, HCM city
Temporary fence
CDM Piles
-0,200
Safety Railling
-0,200
-0,200
Dự án số / Project #:
Hạng Mục / Item:
-5,900
-5,900
-8,100
VQ.LONG
BẢN VẼ THI CÔNG
CONSTRUCTION DRAWING
THINK SAFETY - WORK SAFELY
Rev
No.
Rev Description
Rev Date
Mặt bằng định vị / Key plan:
-1.700 m
-3.700 m
-0.200 m
-2.400 m
-5.900 m
-1.700 m
-8.400 m
-7.300 m
Ta
nk
-0.200 m
of
nk
Ta
-5.900 m
tto
Bo
m
Blo
c
&
kA
Blo
B
ck
-5.900 m
-5.900 m
-8.200 m
-7.300 m
-0.700 m
Tên bản vẽ / Drawing name:
3D_VIEW - S4 EXCAVATOR TO
-8,100m
Số hiệu bản vẽ / Sheet #:
Tỉ lệ / Scale:
Ngày / Date:
Vẽ / Drawn
by:
Author
Kiểm /
Checked by:
THAO PHAM
13/10/2015
S_122
Sửa đổi /
Rev.:
02
Duyệt /
Approved by:
VIET NGO
BẢN VẼ THI CÔNG
Nhà thầu / Contractor:
108 Cao Thang St.,Ward 4, Dist. 3, HCMC, VN
Dự Án / Project:
SKL GATEWAY APARTMENTS
PROJECT
Thao Dien Ward, District 2, HCM city
Dự án số / Project #:
Hạng Mục / Item:
Tên bản vẽ / Drawing name:
1
CONSTRUCT TANKS & RAFT FOUNDATIONS OF BLOCK A, B
STAGE 5 - BUILDING
TANK BOTTOM
BLOCK A & BLOCK B
Số hiệu bản vẽ / Sheet #:
BPTC-
Tỉ lệ / Scale: Ngày / Date: Sửa
đổi /
EX-13