RAMAT NEGEV CENTER
SOIL TREATMENT TECHNOLOGY
BEFORE PLANTING CHERRY TOMATO
Adviser: Mr. Avner Levy
Farmer: Izik Levy
Students:
Tạ Phú Lợi
Lưu Văn Trinh
Trần Đại Thắng
Nguyễn Hữu Trung
CONTENT
1. Objective
2. Introduction
3. Material and method
4. Results and discussion
5. Economies
6. Conclusion
OBJECTIVE
GENERAL OBJECTIVE:
-
Cultivating medium of
plants, the habitat of many
species of beneficial
microorganisms
- Habitat and farming of
human
VARIETY
VARIETY
SOIL
SOIL
INTRODUCTION
Ramat Negev is the biggest region in Israel - 400,000 Hectares.
Sandy soil –
sediments and dunes, continuance of
seashore dunes.“field capacity” 15%
Sandy soil
High soil pH
Low organic material
Salty soil
-- Between Winter and Summer
High radiation
High evapotranspiration
Water salinity
Low humidity
Dust storms
Flash floods
INTRODUCTION
Conditions in the Ramat Negev climate
INTRODUCTION
Characteristic of soil in Ramat Negev
Mainly sandy soil
High soil pH
Low organic material
Soil salinity
Sandy soil
Request:
- Choose the right plant with climate and soil condition here
- Taking measures to improve soil or use appropriate soil treatment before planting seedlings
INTRODUCTION
Characteristics and classification of tomato plants
MATERIAL AND METHOD
•
•
•
•
•
•
•
Green house
Sandy soil
High concentrate salty water
Nylon
Basal fertilizer
Drip lines
Tractor
MATERIAL AND METHOD
Stage 1: killing plant and sanitizing farm:
- Killing plant
- Bankruptcy and cleaning farm
- Expose soil
Stage 2: before planting seedlings:
- Plows / Cultivators make planting beds
- Spread basal fertilizer and mixing soil
- Installing drip irrigation system
(2-4 days)
days)
Spreading basal fertilizer and
Bankruptcy and cleaning
farm
Planting
(10-15 days)
Expose soil under sunlight
(10—15 days)
Incubating soil with
plastic
(15-20 days)
LAYOUT OF SOIL TREATMENT BEFORE PLANTING
mixing soil
(1-2 days)
Installing driplines
RESULT
Picking up dead plant after killing treatment
(1-2 days)
)
Taking out all the dead plant and fruit, remove all driplines
(1-2 days)
Weeding all over the farm
(1-2 days)
•
•
destroy many kind of micro organism, insects and fungi harmful to plants
Target 2
(1-2 weeks)
EXPOSED LAND
Target1
STAGE 1: KILLING PLANT AND SANITIZING FARM
Is the time for the land to rest before a new crop season start
RESULT
RESULT
Creating favorable conditions for growing, harvesting the fruit
RESULT
STAGE 2: TREATMENT BEFORE PLANTING
/ Provide nutrients to the soil to help improve soil fertility, soil acidity
Nutrient supply is critical in the early stages of plant development
SPREADING BASAL
after planting
FERTILIZER
(1-2 days)
Adding a significant amount of land in favor micro organism improves
soil properties
Neutralize soil salinity
Note:
Basal fertilizer should be composted, the compost components mixed at appropriate rate for each species and was purchased at the reputable
manufacturing facility.