Tài liệu Installation ProceduresIntroductionThis document defines the procedures for installing products - Pdf 85

Introduction
This document defines the procedures
for installing products contained in the
KRONE Certified Cabling System. The
Installation Procedures are part of a series
of documents supporting the design, instal-
lation, and use of the KRONE Certified
Cabling System.
KRONE reserves the right, without
notice, to change its products as progress
in engineering or manufacturing methods
or other circumstances may warrant.
If you have questions on the content or
intent of this document, please call the
Tech Support Line at 800-775-5766.
IP-1
Installation Procedures
KRONE Installation & Testing Procedures MK023-01
Printed in USA 1/98
KRONE Installation & Testing Procedures MK023-01
Printed in USA 1/98
IP-2
Installation Procedures
8-Pair HighBand
TM
and Series 2 Frame Mount
(Wall or EIA Rack)
STEP 1:
Secure Type 105 mounting
bracket to mounting frame
using rivets provided. Install

STEP 3:
Secure UMS Brackets to
backboard per diagrams for the
desired layout printed on the
backboard. Use provided rivets
to attach.
STEP 4:
Secure included jumper rings
using rivets provided or install
separate large jumper ring as-
sembly using screws provided.
STEP 5:
Pull Cables through center hole
of bracket and strip back sheath
as indicated.
KRONE Installation & Testing Procedures MK023-01
Printed in USA 1/98
IP-4
Installation Procedures
8-Pair HighBand and 10 Pair Series 2 Rod Mount
Using UMS (Wall Mount)
STEP 1:
Assemble the UMS brackets by
sliding the two halves all the way
together. Repeat for all brackets.
STEP 2:
Attach first (top left) UMS to ply-
wood backboard with top left screw.
Do no tighten screw down all the
way. Using a level, adjust bracket

Secure bottom mounting
adapter (without jumper
rings) level to backboard.
STEP 2:
Snap the Type 105 mounting
bracket into the bottom
mounting adapter (rubber
grommets optional).
STEP 3:
Snap top mounting adapter
(includes jumper rings) onto
mounting Bracket and se-
cure to backboard.
STEP 4:
Route cables from above or
below mounting bracket and
secure as required.
STEP 5:
Beginning at edge of mount-
ing bracket, cut cables 18"
from front edge of mounting
bracket, strip back 6" of
sheath, and split pairs back
4½".
8-Pair HighBand
TM
and Series 2 Termination Block Direct Wall Mount
Bottom Wall Mount
Adapter
Incoming Cables

Type 105
Mounting Bracket
KRONE Tool
UMS
IP-7
Installation Procedures
KRONE Installation & Testing Procedures MK023-01
Printed in USA 1/98
Individual Label Holder
STEP 4:
Repeat steps 1 through 3 work-
ing from bottom to top of mount-
ing bracket for remaining mod-
ules.
STEP 5:
Install block label holder at top
of mounting bracket and label
individual blocks as required.
8-Pair HighBand
TM
Block Termination Procedures
(Wall or EIA Rack) (Cont.)
Type 105
Mounting Bracket
Block Label Holder
UMS
Block Label Holder
Individual Label Holder
KRONE Installation & Testing Procedures MK023-01
Printed in USA 1/98

25-Pair FT Mount (EIA Rack)
25-Pair FT
Termination Block
Mounting Frame
Incoming Cable
Plastic Rivets
IP-9
Installation Procedures
KRONE Installation & Testing Procedures MK023-01
Printed in USA 1/98
25-Pair FT Mount (Wall)
STEP 1:
Assemble brackets to first
position and secure with
screws as shown.
KRONE Installation & Testing Procedures MK023-01
Printed in USA 1/98
IP-10
Installation Procedures
25-Pair FT Mount (Wall) (Cont.)
STEP 3:
Using interlocking tabs, secure
next bracket or wire manager
and secure with four (4) screws.
Continue until all brackets and
or wire manages are secured.
STEP 4:
Install wire management rings
using the rivets provided.
STEP 5:

Termination Block
KRONE Tool
UMS
Mounting Bracket
STEP 1:
Install the 25-Pair FT connector
onto the base, making sure you
install with the comb facing
away and down.
STEP 2:
Dress pairs across contact slots
(maintain twist up to point of
connection). Sheath should be
maintained within 2" of the
connection point.
STEP 3:
Terminate conductors with
KRONE tool or Harris Dually
Blade for 814 or 914 tool handle.
Repeat steps 1 and 2 for remain-
ing cables.
25-Pair FT Block Termination Procedures
KRONE Installation & Testing Procedures MK023-01
Printed in USA 1/98
IP-12
Installation Procedures
UMS
Mounting Bracket
Connector
Base

working from bottom to top of
mounting bracket for re-
maining blocks.
STEP 2:
Label all FT blocks as shown.
25-Pair FT Block Labeling Procedures
KRONE Installation & Testing Procedures MK023-01
Printed in USA 1/98
IP-14
Installation Procedures
Incoming Cables
24 Port
Plug & Play Patch Panel
Installation Procedures
STEP 1:
Secure the patch panel to the
rack.
Plug & Play Patch Panel EIA Rack Mount
STEP 2:
Route cables above or below
right side of the patch panel,
secure as required.
STEP 3:
For each cable in its relative
position cut cable 4" from be-
yond its jack location, strip back
4" of sheath, and split pairsback
3¼".
19” EIA Rack
IP-15

24 Port
Plug & Play Patch Panel
STEP 1:
Route conductors through
center of jack and dress
conductors through contact
slots (maintain twist up to
point of connection). Sheath
should butt up against back
of jack.
STEP 2:
Terminate conductors with
KRONE tool.
Plug & Play Patch Panel Jack Termination