Tài liệu Just-In-Time Manufacturing doc - Pdf 89



Just-In-Time
Just-In-Time
Manufacturing
Manufacturing

Just-In-Time Manufacturing?
Just-In-Time Manufacturing?

What is JIT Manufacturing?
What is JIT Manufacturing?

Where did it come from?
Where did it come from?

What are the main principles?
What are the main principles?

Is it easy to Implement?
Is it easy to Implement?

What phrase best describes JIT?
What phrase best describes JIT?Just-In Time Manufacturing
Just-In Time Manufacturing

Evolved in Japan after World War II, as a result of
Evolved in Japan after World War II, as a result of
their diminishing market share in the auto industry.
their diminishing market share in the auto industry.

Toyota Motor Company
Toyota Motor Company
- Birthplace of the JIT
- Birthplace of the JIT
Philosophy Under Taiichi Ohno.
Philosophy Under Taiichi Ohno.

W. Edwards Deming
W. Edwards Deming

14 points for Management
14 points for Management

JIT is now on the rise in American Industries.
JIT is now on the rise in American Industries.Principles Of JIT Manufacturing
Principles Of JIT Manufacturing

Total Quality Management
Total Quality Management

Production Management
Production Management

Total Quality Management
Total Quality Management

Seek long-term commitment to quality efforts
Seek long-term commitment to quality efforts
with continuous improvement
with continuous improvement

Quality must be a higher priority than cost
Quality must be a higher priority than cost

Minimizing waste
Minimizing wasteTotal Quality Management
Total Quality Management

Eliminate Quality Inspectors
Eliminate Quality Inspectors

Quality is everyone’s responsibility
Quality is everyone’s responsibility



Pull = Made to order
Pull = Made to order

Push = Made for inventory
Push = Made for inventory

Flexability of the system
Flexability of the system

Design For Testability – In the process
Design For Testability – In the process

Poka-Yoke= Mistake-proofing
Poka-Yoke= Mistake-proofing

Throughout entire process
Throughout entire processProduction Management
Production Management

Reduced lot sizes= Shorter cycle times
Reduced lot sizes= Shorter cycle times

Eliminate disruptions in the process
Eliminate disruptions in the process

Standardized Parts/ Simplicity


Nhờ tải bản gốc
Music ♫

Copyright: Tài liệu đại học © DMCA.com Protection Status