Introduction
Questions on the Project Management Professional (PMP®) exam are written from a particular perspective.
The examiners assume certain operating conditions are in place without stating those conditions.
The problem for project managers (PMs) taking the exam is that these assumptions are never clarified by the
Project Management Institute (PMI®). To make matters worse for, these assumptions must be gleaned from
the Project Management Body of Knowledge (PMBOK®).
If you know from the outset what perspective should be tak
en, studying for the exam is greatly simplified.
You
need to know how the examiners were thinking when they wrote the questions
.
Learn to Think Like the PMI
If you have extensive project experience you are likely familiar with the old adage “project management is
responsibility without authority”. Project managers become experts at getting things done without access to
the tools of authority.
However, do not let your experience override one of the underlying assumptions inherent in PMP exam ques-
tions
. As far as the PMI and its exam are concerned,
PMs should have, and therefore do have
, ultimate authori-
ty for a project. In situational exam questions, it is assumed that the PM has the authority to do the right thing
in every situation. This is a far cry from the reality that most people experience.
In order to answer situational exam questions correctly, you must learn to think “PMI”. That is, you must know
the presumptions of the examiners

always have the time and resources to re-calculate the plan and make it their own.
In an ideal project environment, PMs are able to complete the planning process before work begins. They can
refuse to implement changes that have not been analyzed for impacts (without losing their job). In short, they
control the project with a degree of authority that is rare in the real world.
When answering exam questions, imagine a project environment the way you would like it to be. Such is the
environment PMI would like to see become the norm.
Always Be Proactive
When considering what to do in a particular situation – think proactively. Being proactive means thinking
three moves ahead.
For example, say you are the PM on a complex IT project that is centralizing customer data across the enter-
prise. The vice president of marketing calls you and says that the completion date must be moved up two
weeks to mak
e the new database available for a critical industry event.
What do you do?
Immediately ask yourself: Is this a formal change request or just a spur of the moment idea? Does this person
have the authority to force the change?
With which other stakeholders will I need to confer to assess the impact?
Proactive PMs do not just react to situations
,
they think ahead.
In the situation described above
,
proactive PMs
would treat the VP’s request as a routine, although important, change request. PMs would contract senior
team members to determine the viability and impact of the request on other constraints, such as budget and
scope. When fully informed, the PM meets with the change review board. The change review board would
determine what action to take; the PM would implement the board’s decision.
Corrective Action Is the Correct Reaction
Being proactive is also about detecting potential problems before they occur. It is the core motivation of
Monitoring and Controlling processes. We monitor project work results to ensure that they conform to the

can save time and money on the project by avoiding child safety testing.
The product is specifically for adults
and technically does not need to be tested for children. Child safety testing has the advantage of making the
company appear to be child friendly and will reduce liability in the event of an injury involving children.
What should you do?Life-cycle costing looks at the decision in terms of the long-term interests of the organi-
zation. This may be in conflict with the short term interests of the project.
It might be cheaper and easier to avoid child safety testing for now. The project would be finished sooner. But
how would taking such a narrow view of the issues affect the long-term interests of the organization?
To make the best decision you should first consider and determine the implications of not testing, such as
increased liability, and balance this against the short-term savings.
Prudent PMs thinks long term and looks at the big picture. All PMs are expected to do the right thing for a
project,
but not at the expense of the enterprise.
Copyright ©2006 Global Knowledge T
raining LLC. All rights reserved.
Page 4
Communication Is a PM's Primary Role
PMs can expect to spend 90% of their time communicating. This includes actively monitoring what is happen-
ing with their projects and sharing that information with stakeholders.
The PM is the heart of a project. Information is the blood that must flow through the heart. If the heart stops
beating, then information stops circulating and the project body withers.
In a PMI-ideal project environment PMs have the staff necessary to complete the work. They themselves do
not act as a resource or spend their time updating records. Someone else updates the plan and collates
reports. The PMs manage. This does not include correcting code, working with the troops to speed things up, or
filling in for someone who is sick.
In the PMI examiners’ view, PMs are accountable for ensuring the project gets done and done right; they are
not the ones actually doing the work. PMs watch, listen, and direct – they manage resources. They are not
expected to ‘do’. The act of doing takes them away from the art of managing and monitoring.
Err on the Side of Formality
The PMP examiners will expect you to answer questions as though you conduct your job with utmost formali-

Copyright ©2006 Global Knowledge T
raining LLC. All rights reserved.
Page 5


Nhờ tải bản gốc

Tài liệu, ebook tham khảo khác

Music ♫

Copyright: Tài liệu đại học © DMCA.com Protection Status